Example of what we can do

Door Opening Solutions

MKP: a complete business platform with tireless digital helpers and self-improving expert knowledge bases.

One industry taken end to end on the Max Knowledge Platform: every commercial door opening — Division 08 doors and hardware, Division 28 electronic security — carried on a single Opening record inside Max Business System, from the door schedule to the annual fire-door inspection. This is our flagship worked example, the same pattern the Sample Companies demonstrate inside the app: a real trade, run on the platform, with nothing held in a side spreadsheet.

The worked example

One Opening record, eight stages of work

Door Opening Solutions is a surface of Max Business System — its home is with selling and serving, its delivery stages sit with operations — built on one disciplined extension of the platform's own records: the Opening. Projects, sales orders, bills of materials, work orders, documents, quality checks, and maintenance all stay on the platform's native models; the Opening links them, so an opening's money, manufacturing, and service work are never duplicated onto a parallel system. Eight subsurfaces carry the opening through its life:

Subsurface one

Design

The register starts from the door schedule: fire-resistance ratings, egress widths, ADA clearances, and the hardware set for every opening.

Subsurface two

Bid & Procurement

Takeoffs against the specification, with the Division 08 / Division 28 scope split made explicit before buyout — not argued about after it.

Subsurface three

Submittals

Hardware and keying schedules, templates, and approvals tracked per opening, so nothing reaches fabrication on a verbal.

Subsurface four

Fabrication

Doors and frames built only from approved submittals; fire labels and factory preps recorded against the opening they belong to.

Subsurface five

Site

Frames set, doors hung, electrified hardware wired and connected — the field work recorded per opening as it happens.

Subsurface six

Inspect & Close-Out

Clearances, latching, and label checks verified per opening; the turnover package is the register itself, not a binder rebuilt at the end.

Subsurface seven

In Service

The signed-off opening becomes the building's door record: opening number, hardware set, warranty, and history intact from day one.

Subsurface eight

Maintenance and Repair

Annual fire-door inspections scheduled from the register, and repairs recorded against the opening — a managed book of business, not a pile of work orders.

The lifecycle

The road every opening travels

An opening passes through seven stages and four material streams — steel doors, wood doors, standard hardware, electrified hardware — each stage governed by its own authorities. The record has to survive all of them.

Stage 1 · IBC · NFPA 101 · ANSI A117.1

Design & scheduling

The architect assigns fire-resistance ratings — 20 minutes to 3 hours — from the building code and the Life Safety Code, sizes widths to egress capacity, and checks every opening against ADA: 32-inch minimum clear width, maneuvering clearances, operating forces. The security narrative decides which doors take access control and fire-alarm integration.

Stage 2 · SDI · HMMA · WDMA · BHMA · DHI

Specification writing — Divisions 08 & 28

Steel doors are specified to SDI (SDI-100 / ANSI A250.8) for standard commercial work or HMMA for custom and heavy-duty (08 11 13). Wood doors go to WDMA or AWI — veneer cuts, mineral cores for fire ratings, factory finish grades (08 14 16). Hardware is BHMA / ANSI A156, Grade 1, issued as hardware sets (08 71 00). Electrified hardware straddles Division 28 (28 10 00), with fail-safe versus fail-secure sequences and power responsibilities spelled out.

Stage 3 · The scope split

Bidding, estimating & award

Estimators price to SDI and WDMA grades; distributors verify wall construction so frames carry the right anchors, and confirm fire-door hardware is approved for rated assemblies. The standing split: Division 08 supplies the electrified hardware and power supplies; Division 28 supplies card readers, head-end software, and pulls the low-voltage cable. The GC resolves the scope gaps at bid time.

Stage 4 · UL · Intertek

Submittals, testing & fabrication

Rated components are certified by UL or Intertek (Warnock Hersey) under positive-pressure fire testing (UL 10C) before manufacture. Factories machine to approved submittals and affix the label to door edge and frame jamb — and a rated wood door cannot be field-modified without voiding that label. Concealed raceways are built in, so electrified hardware wiring stays inside the rating.

Stage 5 · SDI-105 · NFPA 70

Delivery, rough-in & installation

Hollow metal frames go in early, anchored per SDI-105 — a frame out of plumb by even 1/16 inch binds its hinges. Wood doors arrive late, after climate control is running, or moisture voids the WDMA warranty. Division 28 pulls the wire; electric thru-wire hinges and electrified locksets are connected to NEC Class 2 standards.

Stage 6 · NFPA 80 · ADA

Commissioning & sign-off

The authority having jurisdiction verifies labels visible, legible, and unpainted, and measures clearances to NFPA 80 — typically 1/8 inch at head and jambs, 3/4 inch maximum undercut. Interior non-fire doors open at 5 pounds of force or less; fire doors positively latch. Mag-locks and fail-safe devices are proven against the fire alarm: power drops, egress is free, immediately.

Stage 7 · NFPA 80

Operations & maintenance

NFPA 80 mandates a documented inspection of every fire door assembly at least annually, by a certified Fire Door Assembly Inspector. A closer that will not latch, gasketing gone, a label missing — and a single missing hinge screw voids the fire rating on the spot. Findings become repairs with equivalent BHMA-certified hardware, recorded against the opening.

Where it breaks today

The RACI diagnosis: three structural gaps

Map who is Responsible, Accountable, Consulted, and Informed across the eight phases, and the gaps stop being anecdotes — they are structural. Accountability shifts or dilutes at exactly the handoffs where the work is most expensive to get wrong.

Phase & core deliverableArchitectOwner / FacilitiesHardware ConsultantGen. ContractorDistributorTrades (Integrator / Elec)Manufacturer
1. Design & Code Analysis — door schedule, code requirementsA / RCC––––
2. Specification Writing — Div 08 spec, hardware setsACR–ICC
3. Bidding & Award — estimates, substitutions, buyoutCIIARIC
4. Submittals & Detailing — hardware & keying schedulesACCCRCI
5. Procurement & Fab — templates, POs, manufacturingI––IA–R
6. Installation — setting frames, hanging, wiringI––ACR–
7. Inspection & Closeout — NFPA 80 tests, turnover packageAIRRCC–
8. Ops & Maintenance — annual inspections, upgrades–A––CRI

R = Responsible (does the work) · A = Accountable (owns the outcome — one per phase) · C = Consulted · I = Informed

Gap one · Phase 6

The Division 08/26/28 convergence

At installation the GC is Accountable, but Responsibility splits three ways — carpenters on mechanical hardware, electricians on high voltage, integrators on low voltage — while the Distributor, the one party who understands how the hardware actually functions, is only Consulted, disconnected from the wiring and the testing.

Gap two · Phases 7 to 8

The data break at closeout

The Architect owns the project through closeout; at turnover the Owner inherits total accountability for life safety. The Distributor and the Consultant — the only parties holding clean data on the opening number, the warranty, and the hardware set — drop off the matrix entirely. The building's door knowledge is lost on day one of operations. This is the gap the Opening record closes by construction: the data never changes hands, because it never leaves the register.

Gap three · Phases 2 and 3

Spec protection vs. substitution

The Consultant writes the specification, often subsidized by the Manufacturer. At bidding, accountability moves to the GC, whose incentive is cost reduction — and the value engineering and substitution requests land directly on the specification the Manufacturer invested in. On the register, the specified set and every proposed substitution sit on the same record, visible to everyone with a stake in it.

Read it in full

The Door Opening eight-pager

The complete document: the platform under the surface, the eight subsurfaces, and what changes for the company — bid day, the shop, the field, compliance, and the service book.

Start with a conversation

Book a complimentary 30-minute discovery session. Tell us where it hurts most, and we will give you an honest read on what we would fix first, and what it would cost. No pitch deck, no pressure.

Book your complimentary 30-minute discovery session

sales@chilesand.co  ·  (828) 521-0297